A summary of the project

One overpass bridge with 3*10 meter spans, two 2*10 meter spans, three 1*10 meter spans, and a 108-meter retaining wall.

The construction of a 17-kilometer section of this highway included one overpass bridge with 3*10 meter spans, two 2*10 meter spans, three 1*10 meter spans, and a 108-meter retaining wall.

Termination Year

2005

Start Year

1996

Road width

2 × 27.5 m

Road Length

17 km

State : Zanjan