A summary of the project
In this substructure project, 18.5 km of the Miyane-Ardabil railway was implemented
The project involved the construction of 18.5 kilometers of substructure on the Mianeh-Ardabil railway. The technical structures of the project included 8 tunnels with a total length of about 3500 meters, a special metal bridge with 4*60 meter spans, and 3 other bridges with a total of 8 spans of about 30 meters.
Termination Year
In progress
Start Year
1400
Road width
7 m
Road Length
18 km
State: Ardabil