A summary of the project
2 tunnels totaling 800 meters, one grade-separated interchange bridge with loops and ramps, one bridge with three 18-meter spans, and three special river crossings.
This project included the construction of 11 kilometers of road, 2 tunnels totaling 800 meters, one grade-separated interchange bridge with loops and ramps, one bridge with three 18-meter spans, and three special river crossings.
Termination Year
2009
Start Year
2007
State : Bushehr
Parsian-Asalooyeh Highway lot2
It was implemented for the first time in the country by non-industrial EPC method.